Labs Pro?Start a project ↗
Buyer pathway

Build a CGI campaign plan from rough launch goals

This pathway plans CGI for product launch campaigns. It is not about planning permission or architectural visuals. Start here when you know you need launch visuals but have not pinned down deliverables, timings, formats or the brief. You finish with a structured planning draft for a studio to review, not a confirmed schedule.

G-Lab Keyz Hydrogen front view with RGB keys and pink-to-yellow background panels, exported from the original XO3D render
Keyz Hydrogen / G-Lab. Original RGB front-view render by XO3D. View source

What each tool hands to the next

The five tools do not share data. Each keeps its own result, so copy or download each output and carry it into the next step yourself. Use them in this order, and skip the electronics planner unless your product is a device or something like one.

ToolBringKeepDecision it helps with
Product Launch Asset ChecklistLaunch channels and the stills, films and formats you think you needThe asset list, gaps and assumptions (Copy Summary)Which assets the launch actually needs
Consumer Electronics CGI Planner (optional)Device type, number of products, colourways, main material and channelShot and version counts (Copy Summary or the table)How many variants and screen states to plan for
Campaign Timeline PlannerThe launch date, the deliverables, complexity and a bufferMilestone dates and risks (copy or download)Which dates are fixed and where reviews sit
Brief BuilderThe asset list, the dates and your answers to seven questionsA structured brief draft (copy or download)What the studio is being asked to make
CGI Brief Scoring ToolThe brief draftScores by area and missing inputs (Copy Summary)Which questions are still open before it goes out

Inputs and outputs as each tool shows them today. Nothing transfers between tools automatically.

CGI production in outline: what waits on whatIllustrative only. Not an agreed studio schedule, and real projects can overlap or repeat stages. Each stage waits on the decision named in it.
  1. 1. Confirm product inputsCAD revision, finishes and any screen content. Waits on the product team.
  2. 2. Geometry reviewThe model is checked against the product. Waits on approved inputs.
  3. 3. Look approvalMaterials, lighting and camera style. Waits on approved geometry.
  4. 4. ProductionStills and animation are made. Waits on an approved look.
  5. 5. FeedbackReview rounds with a named reviewer. A late review moves every later stage.
  6. 6. Final deliveryExports, formats and versions. Waits on final approval.
The decision

What this solves

Campaign teams often brief a studio with missing deliverables, loose timings and unclear sign-off points. The result is slow quoting and avoidable revision pressure.

Who decides, and which dates are fixed

A plan is only as firm as its decisions. Before the brief goes out, write down who approves each kind of decision and which dates cannot move. A draft with a missing CAD revision or no named approver is still useful, as long as the gap is written down.

Record:

  • Product truth: who confirms the CAD revision, dimensions, finishes and any screen content.
  • Creative direction: who approves the look, the story and the shot list.
  • Final exports: who signs off formats, versions and delivery.
  • Dates: mark each one fixed (the launch, a trade show) or provisional (everything that waits on a decision).
  • Dependencies: list what is still missing, such as a CAD revision, material samples or approved copy, with the date you expect it.

A plan, not a project board

These tools help you prepare a CGI production plan and a brief. They do not run the project: there is no shared workspace, no automatic rescheduling when a date moves and no task notifications. Once a studio is on board, track owners, status and dependencies in the project system you agree with them.

When the plan is ready, turn the plan into a studio brief. A studio can then confirm the inputs, the scope and a schedule that fits its capacity, which the draft dates in the timeline cannot do.

What the Sony project shows about planning

On the Sony WF-C710 launch, ImageNova commissioned XO3D for two short animated segments to sit inside ImageNova's full-length commercial, plus feature-led imagery and rendered colourways composited into ImageNova's product photography. The planning lesson is the dependency: the case study records that, when a film mixes live action and CGI, the CGI team needs the live action first so the camera moves can be matched. If your campaign mixes photography and CGI, put that handoff in the timeline as its own dated step.

This pathway and its tools were not used to plan that project, and no launch result is claimed here.

Tools for this task

Start with these tools

Use the tools in order, or jump straight to the one that matches the question in front of you.

Buyer tool Product Launch Asset Checklist List stills, motion, formats, channel assets and launch gaps. Open tool
Buyer tool Consumer Electronics CGI Planner Scope device variants, finishes, screen content, motion and electronics-specific supplier inputs. Open tool
Buyer tool Campaign Timeline Planner Work backwards from launch date into a production schedule. Open tool
Buyer tool Brief Builder Turn campaign context into a structured CGI brief. Open tool
Buyer tool CGI Brief Scoring Tool Score clarity, missing inputs and supplier checks before the brief goes out. Open tool

From idea to deliverable

See what you are planning for.

Explore different studio projects. CGI by XO3D, shown as visual references.

Two G-Lab Keyz Hydrogen keyboards in black and orange colourways against a warm orange and yellow studio background
Keyz Hydrogen / G-Lab. Final launch-film composition by XO3D. View source

Build a campaign, not just a single frame.

Plan hero images, supporting details and the formats each channel needs. Different compositions need different production time.

Plan the asset budget
Workflow

Step-by-step workflow

The sequence keeps the work practical and reduces the usual guesswork before production.

Build the production timeline

Work backwards from the launch date and mark which dates are fixed and which wait on a decision.

Open tool

Write the production brief

Turn the plan into a structured brief draft, with the open questions written down.

Open tool

Score the brief before it goes out

Check clarity, missing details and supplier assumptions, then fix the weak areas.

Open tool
Example outcome

A structured planning draft: the asset list, a provisional schedule with review points, the product inputs you have and the ones still missing, who approves what, and the questions a studio needs to confirm.

Basis and limitations

The pathway mirrors how a studio triages a campaign before assigning 3D, creative direction and delivery time. Planning guidance reflects common CGI production dependencies and how each linked tool behaves today; the Sony case study was read on 5 November 2026.

Common mistakes
  • Leaving review rounds out of the timeline.
  • Briefing only hero assets while forgetting channel cutdowns.
  • Asking for a quote before CAD, references and deliverables are defined.

Keep the next step clear.

Agree the deliverables. Plan the production. Review the right version.

Find a connected workflow ↗
Work with XO3D

Related XO3D services

Use the tools to clarify the task. For a product campaign that needs creative direction and production, explore the relevant XO3D programme.

Named proof

See it in production

A published project where CGI had to fit another team's production. This pathway was not used to plan it.

Next pages

Keep going

FAQ

Questions this page answers

What should a CGI campaign brief include?

The product, the audience, the launch channels, the asset list, the dates (fixed or provisional), references, technical inputs, who approves each stage, and the decisions that are still open.

Can I plan before CAD files are ready?

Yes. Flag the CAD revision, material references and dimensions as dependencies, with the date you expect each one, so the studio can see what the schedule waits on.

What is the fastest way to reduce quote delays?

Send what you know: the goals, the deliverables you are sure of, the fixed dates and the decisions still open. Creative direction can change which assets are worth making, so an early conversation with gaps written down is better than waiting for a perfect plan.

Is a draft schedule the same as studio capacity?

No. The timeline works back from your launch date using rules of thumb. A studio has to confirm the inputs, the scope and its own capacity before any date is agreed.

Next step

Plan launch visuals with XO3D

Bring the product, audience, launch date and required assets. We can help define the creative direction and production scope from there.

Tell us about your brief

Last reviewed: 2026-06-04

Updated: 2026-11-05

About the studio behind these tools

Practical tools from XO3D, a director-led product CGI studio working with tech, industrial and premium consumer brands on product films, launch stills and interactive experiences.

That makes us the right choice for launch-critical work where the visual standard has to be high and the product may not exist yet.

It makes us the wrong choice for three things: hundreds of routine SKUs to a fixed template, a website that requires a specific configurator platform, and the campaign idea itself.